Rome Metro B Line to Undergo Weekend Closure for Track Maintenance
Rome, February 2 – Significant disruptions to public transport in Rome are expected this weekend as a section of the Metro B and B1 lines will be closed for scheduled maintenance work. The closure, impacting the route between San Paolo and Rebibbia/Ionio, is set to begin at 9 PM on Friday, January 30, and will continue until 5:30 AM on Sunday, February 1. This intervention is crucial for ensuring the safety and efficiency of the metro system.
Affected Metro B and B1 Sections and Alternative Transport
The interruption of train services will specifically affect the Metro B and B1 lines on the San Paolo to Rebibbia/Ionio stretch, and vice versa, throughout the weekend. To mitigate inconvenience for commuters, Atac, Rome’s public transport company, has activated two substitute bus lines:
- MB7: Operating between San Paolo and Rebibbia.
- MB1: Running from Piazza Bologna to Viale Ionio.
Passengers traveling on the B1 line will need to transfer at Piazza Bologna to continue their journey by bus. The last metro trains on January 30 will depart at 9 PM in both directions, after which services will be limited to the San Paolo-Laurentina section.
Ticket Offices and Exchange Car Parks
Adding to the weekend’s transport challenges, ticket offices at Conca d’Oro, Termini, and Piramide stations will be closed on January 31 and February 1. Exchange car parks along the Metro B line will, however, maintain their regular operating hours:
- January 30 and 31: 5:15 AM to 2:15 AM
- February 1: 5:15 AM to 12:15 AM
Challenges for Fiumicino Airport Access
Reaching Fiumicino Airport by public transport this weekend is expected to be particularly challenging. This is due not only to the metro closure but also to ongoing railway circulation interruptions between Tiburtina and Ostiense stations, related to the construction of the Pigneto hub. Normally, passengers could take Metro B from Tiburtina to Piramide and then proceed to Ostiense for a train to the airport. This route will not be feasible during the metro shutdown.
Context of the Maintenance Work
The planned maintenance is part of a broader effort by Atac to ensure the structural integrity and operational safety of Rome’s public transport infrastructure. These works are essential for preventing future disruptions and maintaining a reliable service for the city’s residents and visitors. While temporary closures can cause inconvenience, they are vital for the long-term health of the transport network.
Impact on Commuters and City Life
The partial closure of a major metro line is expected to impact thousands of daily commuters, particularly those relying on the Metro B and B1 lines for their weekend travel. Residents are advised to plan their journeys in advance, utilize the provided bus alternatives, and consider extra travel time. The city authorities aim to minimize disruption by providing clear information and alternative routes.
This weekend’s maintenance work underscores the continuous need for investment in urban infrastructure to support the growing demands of a bustling metropolis like Rome. Authorities are working to ensure that services return to normal as quickly as possible, with full metro operations resuming by the morning of February 1.
Source: https://www.romatoday.it/cronaca/metro-b-b1-chiusa-30-31-january-1-february-2026.html